Back
Hawangen, Germany
Double membrane gas storage
Year of construction 2010 / refurbishment 2023 - 3 storage tanks
The biogas plant built in 2010, which is fed with renewable raw materials, was upgraded and refurbished in 2023. The existing gas storage tanks were converted to a usable gas storage volume of approx. 2,700 m³.
The double-membrane gas storage tanks were also equipped with a belt tensioning system, service opening and pressure gauge. The existing substructure could continue to be used.